São Mamede
- Portugal
- Wind
- Operational
Capacity
7 MW
Production
14,429 MWh/year
CO2 saved
1,641 Tonnes/year
The plant has an installed capacity of 6,9 MW that consists of 3 using the technology of Nordex N90 – R80
This website uses cookies to ensure you get the best experience on our website. Learn more about our cookies.
To do that, please confirm that we may use functionality cookies.
Find out more in our Cookie Policy and Privacy Policy.
We operate onshore and offshore wind, solar, waste to energy, biomass and energy storage projects in Europe and the US. Check out our assets by country, technology or stage of development on this interactive map.
211 – 220 of 259 projects
7 MW
14,429 MWh/year
1,641 Tonnes/year
The plant has an installed capacity of 6,9 MW that consists of 3 using the technology of Nordex N90 – R80
46 MW
90,000 MWh/year
24,200 Tonnes/year
The plant will fall within the territory of the Municipality of Belpasso, in the Finocchiara district.
The connection works to the national electricity grid, which provide for connection to Terna’s HV grid via the future “Pantano D’Arci” electricity transformation station, will instead fall within the Municipality of Catania.
6 MW
6,244 MWh/year
691 Tonnes/year
The plant has an installed capacity of 6 MW that consists of 2 using the technology of Ecotecnia EC-100
10 MW
28,806 MWh/year
5,202 Tonnes/year
Following fifteen months of construction, the five turbines at Seamer Wind Farm opened for business in November 2012. The wind farm ‘s turbines are situated on land owned by three neighbouring farms located between the villages of Seamer and Hilton. Hilton is in the civil parish of the borough of Stockton-on-Tees and has an estimated population of around 400 while Seamer is in the Hambleton district of North Yorkshire, England, with an estimated population of 566. Despite their proximity to Teesside, the villages have a real rural feel, and there are a number of well-used public footpaths in the surrounding area. The wind farm ‘s turbines are rated at just over 2MW, giving the site an installed capacity of 10.25MW with the ability to generate enough energy to power .
12 MW
22,226 MWh/year
1,160 Tonnes/year
The plant has an installed capacity of 12 MW that consists of 6 using the technology of Vestas V90
12 MW
24,943 MWh/year
2,971 Tonnes/year
The plant has an installed capacity of 12 MW that consists of 8 using the technology of General Electric GEWE 1.5 SL
32 MW
69,036 MWh/year
The plant has an installed capacity of 32,2 MW that consists of 14 using the technology of Enercon E-92
8 MW
24,880 MWh/year
4,676 Tonnes/year
Sisters Wind Farm is a near neighbour to Ventient Energy ‘s North Steads site and is located on the site of a restored former open cast coal mine near Widdrington Village in Northumberland. Widdrington, which is nearly six miles north east of Morpeth, has an interesting history dating back to the Norman era with a Grade 1 listed church and a ruined 18th century castle. The wind farm ‘s turbines are rated at just over 2MW, giving the site an installed capacity of 8.2MW with the ability to generate enough energy to power .
2 MW
1,601 MWh/year
1,009 Tonnes/year
Snyder Road PV solar project consists of a field with photovoltaic panels to convert solar energy into electric energy located close to the towns of Lansing and Northeast Ithaca in the State of New York, U.S.A. With a capacity of 2.06 MWp and 6768 polycrystalline silicon PV modules set to a tilt angle of 17°, this plant has been grid-connected and has produced clean energy since June 2018.
22 MW
44,900 MWh/year
12,100 Tonnes/year
The Sole Siciliano 1, 2, 3 & 4 plants will be built within the territory of the Municipality of Santa Croce Camerina, in the Spinazza district at a distance of a few hundred meters from each other and will be connected to the E-Distribuzione MT network via the existing “Cabina Santa Croce Camerina”.