Trysglwyn

  • United Kingdom
  • Wind
  • Operational
  • Capacity

    6 MW

  • Production

    11,778 MWh/year

  • CO2 saved

    2,567 Tonnes/year

Trysglwyn Wind Farm is situated on farmland that ‘s used for grazing sheep and cattle as well as for arable purposes. It also hosts an annual pheasant shoot  and the wind farm is accessed via an unclassified road that connects it with the village of Rhosboyl in Anglesey. Rhosboyl (with a population of around 1100) is about 2.5 miles from the town of Amlwch which was the second largest town in Wales in the late 18th century thanks to the nearby copper mine at Parys Mountain. Construction work on Trysglwyn Wind Farm began in 1996, taking around a year to complete. Its 14 turbines are rated at 450kW, giving the site an installed capacity of 6.3MW with the ability to generate enough energy to power.

Ty-Ru

  • France
  • Wind
  • Operational
  • Capacity

    10 MW

  • Production

    19,437 MWh/year

  • CO2 saved

    16,000 Tonnes/year

This wind farm is located near the English Channel, 6 miles to the east of Morlaix and very close to the national road going to Brest and Rennes. Around half a mile south of the site is the Monts d’Arrée massif, the highest point in Brittany (1,263 feet). In the surrounding area, the land is used partly for agriculture and party for local and regional light industry. The land on which the site is located belongs to private owners who use it for agriculture and stockbreeding. Energy production is channeled to an EDF power station approximately 5 miles away via an underground cable following existing roads, precisely to minimize the environmental impact. For the construction of the wind farm, turbines with a power of around 2 MW were chosen, for a total installed power of 10 MW. Clean energy produced per year equivalent to the needs of: Around 5,000 households Amount of CO2 saved: around 16 tons per year.

Ucedo

  • Spain
  • Wind
  • Awaiting authorisation
  • Capacity

    25 MW

  • CO2 saved

    49,091 Tonnes/year

The Castillo Eólico León cluster comprises the wind projects of Porqueros, Ucedo and Veldedo de Renantis and will be located in the municipalities of Magaz de Cepeda, Brazuelo, Villagatón, Santa Colomba de Somoza and Torre del Bierzo, in the province of León (Spain). .
These new wind farms will mean a total estimated production of 235 GWh/year, enough to supply energy to more than 30,000 homes.

Union Spring 40

  • United States
  • Solar
  • Operational
  • Capacity

    5 MW

  • Production

    8,814 MWh/year

  • CO2 saved

    775 Tonnes/year

Community Solar project in Upstate NY.

Union Spring 963

  • United States
  • Solar
  • Operational
  • Capacity

    5 MW

  • Production

    8,388 MWh/year

  • CO2 saved

    775 Tonnes/year

Community Solar project in Upstate NY.

Vado Ligure Storage

  • Italy
  • Storage
  • Operational
  • Capacity

    9 MW

BESS (Battery Energy Storage System), consisting of 2 x 4800 kVA inverters and 2 separate battery assemblies, with Lithium Ion storage system technology, for a total apparent power of 9 MW and 8MWh of installed capacity. The project is part of the Fast Reserve pilot projects pursuant to ARERA Resolution 300/17/R/eel, aimed at introducing an ultra-rapid activation grid service in compliance with the Ultra-Rapid Frequency Regulation Service Regulation.

Website

Valle di Zasa

  • Italy
  • Solar
  • Awaiting authorisation
  • Capacity

    30 MW

  • Production

    51,600 MWh/year

  • CO2 saved

    13,900 Tonnes/year

Valle di Zasa photovoltaic plant in the province of Palermo has a total rated power of about 29.87 MW divided into five macro areas. The largest portion of the plant – 4 out of 5 areas – is located in the territory of the municipality of Campofelice di Fitalia; one area in the territory of the municipality of Mezzojuso; while in the territory of the municipality of Ciminna, the storage system and infrastructure for connecting the plant to TERNA SpA’s grid will be built.

Website

Vallée du Moulin

  • France
  • Wind
  • Operational
  • Capacity

    12 MW

  • Production

    9,237 MWh/year

  • CO2 saved

    1,314 Tonnes/year

The plant has an installed capacity of 12 MW that consists of 4 using the technology of Ecotecnia EC-100

Varimpré

  • France
  • Wind
  • Operational
  • Capacity

    13 MW

  • Production

    22,276 MWh/year

  • CO2 saved

    1,528 Tonnes/year

The plant has an installed capacity of 12,5 MW that consists of 5 using the technology of Nordex N90

Vatines

  • France
  • Wind
  • Operational
  • Capacity

    13 MW

  • Production

    19,772 MWh/year

  • CO2 saved

    1,285 Tonnes/year

The plant has an installed capacity of 12,5 MW that consists of 5 using the technology of Nordex N90

© 2026 Nadara Limited – Company number SC546368