This website uses cookies to ensure you get the best experience on our website. Learn more about our cookies.

Skip to main content
Background image Nadara

Our Sites

Filter options

Filter by location

Filter by technology

Filter by status

Pauvres

  • France
  • Wind
  • Operational
  • Capacity

    15 MW

  • Production

    30,498 MWh/year

  • CO2 saved

    2,019 Tonnes/year

The plant has an installed capacity of 15 MW that consists of 5 using the technology of Vestas V117

Perales

  • Spain
  • Wind
  • Awaiting authorisation
  • Capacity

    48 MW

  • CO2 saved

    106,539 Tonnes/year

The Castillo Eólico Palencia cluster comprises the wind projects of Villaherreros, Villaumbrales and Perales de Renantis and will be located in the municipalities of Villaherreros, Villasarracino, Villaumbrales, Perales and Becerril de Campos, in the province of Palencia. These new wind farms will mean a total estimated production of 510 GWh/year, enough to supply energy to more than 50,000 homes.

Pergole

  • Italy
  • Solar
  • Awaiting authorisation
  • Capacity

    51 MW

  • Production

    100,700 MWh/year

  • CO2 saved

    27,100 Tonnes/year

With an area of about 108 hectares on flat land, the photovoltaic plant will fall within the Municipality of Calatafimi Segesta, in the Pergole district, while the connection works to the national electricity grid will fall within the Municipality of Monreale.

Website

Petite Pièce

  • France
  • Wind
  • Operational
  • Capacity

    3 MW

  • Production

    2,176 MWh/year

  • CO2 saved

    200 Tonnes/year

The plant has an installed capacity of 3 MW that consists of 1 using the technology of Ecotecnia EC-100

Petralia Sottana

  • Italy
  • Wind
  • Operational
  • Capacity

    22 MW

  • Production

    35,738 MWh/year

  • CO2 saved

    12,134 Tonnes/year

The Petralia Sottana wind farm is in the heart of northern Sicily, in the province of Palermo. It extends partly along the ridge of Mount Chibbò, arranged in a north-eastern direction at an altitude of between 2,300 and 2,950 feet and along its slopes toward the district of Garisi.

Pièces de Vignes

  • France
  • Wind
  • Operational
  • Capacity

    12 MW

  • Production

    16,201 MWh/year

  • CO2 saved

    1,378 Tonnes/year

The plant has an installed capacity of 12 MW that consists of 4 using the technology of Ecotecnia EC-100

Plouvien

  • France
  • Wind
  • Operational
  • Capacity

    10 MW

  • Production

    3,162 MWh/year

  • CO2 saved

    656 Tonnes/year

The plant has an installed capacity of 10,4 MW that consists of 8 using the technology of Siemens Bonus1,3

Porqueros

  • Spain
  • Wind
  • Awaiting authorisation
  • Capacity

    25 MW

  • CO2 saved

    49,091 Tonnes/year

The Castillo Eólico León cluster comprises the wind projects of Porqueros, Ucedo and Veldedo de Renantis and will be located in the municipalities of Magaz de Cepeda, Brazuelo, Villagatón, Santa Colomba de Somoza and Torre del Bierzo, in the province of León (Spain). .
These new wind farms will mean a total estimated production of 235 GWh/year, enough to supply energy to more than 30,000 homes.

Porto Viro

  • Italy
  • Solar
  • Awaiting authorisation
  • Capacity

    6 MW

  • Production

    8,487 MWh/year

  • CO2 saved

    2,279 Tonnes/year

The photovoltaic plant called Portoviro, located in the Veneto Region in Cà Cappello in the municipality of Porto Viro in the province of Rovigo, has a total nominal power of approximately 6.2 MW and consists of 10,866 fixed photovoltaic modules arranged in a “double sail” and with East-West orientation.

Website

Preuseville

  • France
  • Wind
  • Operational
  • Capacity

    6 MW

  • Production

    13,805 MWh/year

  • CO2 saved

    888 Tonnes/year

The plant has an installed capacity of 6 MW that consists of 3 using the technology of Vestas V100

© 2026 Nadara Limited – Company number SC546368