More than 1,000 and we’re growing - join us!
We have offices in Edinburgh, Lisbon, London, Madrid and Milan. Our teams are a mix of on-site and remote.
The best answer to that is on our sites page.
Big Fish in Sicily, at 227MW. It was an incredible project, spanning 15 separate plots and with Mount Etna as a backdrop. Read more about Big Fish.
We have an installed capacity of just over 4GW.
In 2024, we produced 9,276GWh of renewable energy from wind, solar and biomass. That’s enough to power 2.3m families of four every year (4kW per family).
In 2024, our carbon footprint was 208,066tCO2eq, 68% of which was in our value chain (we’re working on that by connecting more closely with our suppliers).
In 2024 our renewable energy production resulted in 1,385,758tCO2eq being avoided, that’s s our carbon footprint.