This website uses cookies to ensure you get the best experience on our website. Learn more about our cookies.

Skip to main content

Nadara in Spain

Our sites in Spain

Filter options

Filter by technology

Filter by status

Campos Salados

  • Spain
  • Solar
  • Awaiting authorisation
  • Capacity

    48 MW

  • Production

    200,000 MWh/year

  • CO2 saved

    35,949 Tonnes/year

Campos Salados project will be located in the municipality of Carcaixent, in the province of Valencia. This new photovoltaic park is estimated to produce 200 GWh/year, enough to supply energy to more than 30,000 households.

Website

Bon Vent Vilalba

  • Spain
  • Wind
  • Operational
  • Capacity

    50 MW

  • Production

    118,781 MWh/year

  • CO2 saved

    20,320 Tonnes/year

The plant has an installed capacity of 49,8 MW that consists of 21 using the technology of Vestas V90

Cabezo de San Roque

  • Spain
  • Wind
  • Operational
  • Capacity

    23 MW

  • Production

    47,494 MWh/year

  • CO2 saved

    15,000 Tonnes/year

This wind farm is owned and operated by Eólica de Cabezo San Roque, a subsidiary of Renantis, and is located in the municipality of La Muela, around 18 miles south-west of Zaragoza in the Spanish region of Aragon. It is situated on a vast plateau, around 2,000 feet above sea level. The 23.25-MW wind farm includes 31 turbines and provides enough clean energy for over 16,000 households, reducing greenhouse gas emissions by around 15,000 tons per year.

Campanario

  • Spain
  • Wind
  • Operational
  • Capacity

    38 MW

  • Production

    88,730 MWh/year

  • CO2 saved

    15,250 Tonnes/year

The plant has an installed capacity of 38 MW that consists of 19 using the technology of Vestas V90

Campos de Levante

  • Spain
  • Solar
  • Awaiting authorisation
  • Capacity

    102 MW

  • Production

    200,000 MWh/year

  • CO2 saved

    41,780 Tonnes/year

The PSF Campos de Levante project will be located in Chiva, Valencia. This new photovoltaic plant will produce an estimated 200 GWh/year, enough to supply energy to more than 80,000 households.

Website

Campos de Zuloaga

  • Spain
  • Solar
  • Awaiting authorisation
  • Capacity

    56 MW

  • Production

    119,000 MWh/year

  • CO2 saved

    24,859 Tonnes/year

Campos de Zuloaga project will be located between the municipalities of Cizur and Cendea de Olza in Navarra (Spain). This new photovoltaic park is estimated tol produce 119 GWh/year, enough to supply energy to more than 20,000 households.

Website

Carrecastro

  • Spain
  • Wind
  • Operational
  • Capacity

    10 MW

  • Production

    28,497 MWh/year

  • CO2 saved

    17,000 Tonnes/year

This wind farm consists of 4 turbines, for a total capacity of 10 MW. The project also included new roads and road improvements, as well as electricity infrastructure such as ground cables, switchgears and a transformer substation. It is estimated that the wind farm will produce up to 34 GWh per year, equivalent to the electricity consumption of around 10,000 households.

Castillo Eólico León

  • Spain
  • Wind
  • Awaiting authorisation
  • Capacity

    75 MW

  • Production

    235,000 MWh/year

  • CO2 saved

    49,091 Tonnes/year

The Castillo Eólico León cluster comprises the wind projects of Porqueros, Ucedo and Veldedo de Renantis and will be located in the municipalities of Magaz de Cepeda, Brazuelo, Villagatón, Santa Colomba de Somoza and Torre del Bierzo, in the province of León (Spain). .
These new wind farms will mean a total estimated production of 235 GWh/year, enough to supply energy to more than 30,000 homes.

Website

Castillo Eólico Palencia

  • Spain
  • Wind
  • Awaiting authorisation
  • Capacity

    144 MW

  • Production

    510,000 MWh/year

  • CO2 saved

    106,539 Tonnes/year

The Castillo Eólico Palencia cluster comprises the wind projects of Villaherreros, Villaumbrales and Perales de Renantis and will be located in the municipalities of Villaherreros, Villasarracino, Villaumbrales, Perales and Becerril de Campos, in the province of Palencia. These new wind farms will mean a total estimated production of 510 GWh/year, enough to supply energy to more than 50,000 homes.

Website

Cerros de Radona

  • Spain
  • Wind
  • Operational
  • Capacity

    40 MW

  • Production

    87,398 MWh/year

  • CO2 saved

    14,403 Tonnes/year

The plant has an installed capacity of 40 MW that consists of 16 using the technology of General Electric GE2,5xl

Dehesilla I

  • Spain
  • Wind
  • Operational
  • Capacity

    47 MW

  • Production

    88,066 MWh/year

  • CO2 saved

    14,832 Tonnes/year

The plant has an installed capacity of 46,875 MW that consists of 25 using the technology of Gamesa G90

Dehesilla II

  • Spain
  • Wind
  • Operational
  • Capacity

    47 MW

  • Production

    89,732 MWh/year

  • CO2 saved

    14,635 Tonnes/year

The plant has an installed capacity of 46,875 MW that consists of 25 using the technology of Gamesa G90

Desafio Solar

  • Spain
  • Solar
  • Operational
  • Capacity

    47 MW

  • Production

    88,637 MWh/year

El Nogal

  • Spain
  • Wind
  • Operational
  • Capacity

    24 MW

  • Production

    61,676 MWh/year

  • CO2 saved

    10,667 Tonnes/year

The plant has an installed capacity of 24 MW that consists of 12 using the technology of Vestas V90

Esquileo

  • Spain
  • Wind
  • Operational
  • Capacity

    47 MW

  • Production

    89,121 MWh/year

  • CO2 saved

    15,135 Tonnes/year

The plant has an installed capacity of 46,875 MW that consists of 25 using the technology of Gamesa G90

Fatarella

  • Spain
  • Wind
  • Operational
  • Capacity

    48 MW

  • Production

    150,260 MWh/year

  • CO2 saved

    25,896 Tonnes/year

The plant has an installed capacity of 48,3 MW that consists of 21 using the technology of Siemens WT-2.3

Fuente Vain

  • Spain
  • Wind
  • Operational
  • Capacity

    32 MW

  • Production

    82,571 MWh/year

  • CO2 saved

    14,196 Tonnes/year

The plant has an installed capacity of 32 MW that consists of 16 using the technology of Vestas V90

Fuentes

  • Spain
  • Wind
  • Operational
  • Capacity

    18 MW

  • Production

    42,946 MWh/year

  • CO2 saved

    7,304 Tonnes/year

The plant has an installed capacity of 18 MW that consists of 9 using the technology of Vestas V90

La Dehesica

  • Spain
  • Wind
  • Operational
  • Capacity

    29 MW

  • Production

    69,614 MWh/year

  • CO2 saved

    10,614 Tonnes/year

The plant has an installed capacity of 28,5 MW that consists of 19 using the technology of General Electric GE1,5sle

La Navica

  • Spain
  • Wind
  • Operational
  • Capacity

    30 MW

  • Production

    74,136 MWh/year

  • CO2 saved

    12,007 Tonnes/year

The plant has an installed capacity of 30 MW that consists of 20 using the technology of General Electric GE1,5xle

Munera I

  • Spain
  • Wind
  • Operational
  • Capacity

    40 MW

  • Production

    120,224 MWh/year

  • CO2 saved

    18,110 Tonnes/year

The plant has an installed capacity of 39,6 MW that consists of 22 using the technology of Vestas V90

Perales

  • Spain
  • Wind
  • Awaiting authorisation
  • Capacity

    48 MW

  • CO2 saved

    106,539 Tonnes/year

The Castillo Eólico Palencia cluster comprises the wind projects of Villaherreros, Villaumbrales and Perales de Renantis and will be located in the municipalities of Villaherreros, Villasarracino, Villaumbrales, Perales and Becerril de Campos, in the province of Palencia. These new wind farms will mean a total estimated production of 510 GWh/year, enough to supply energy to more than 50,000 homes.

Porqueros

  • Spain
  • Wind
  • Awaiting authorisation
  • Capacity

    25 MW

  • CO2 saved

    49,091 Tonnes/year

The Castillo Eólico León cluster comprises the wind projects of Porqueros, Ucedo and Veldedo de Renantis and will be located in the municipalities of Magaz de Cepeda, Brazuelo, Villagatón, Santa Colomba de Somoza and Torre del Bierzo, in the province of León (Spain). .
These new wind farms will mean a total estimated production of 235 GWh/year, enough to supply energy to more than 30,000 homes.

San Lorenzo D

  • Spain
  • Wind
  • Operational
  • Capacity

    34 MW

  • Production

    61,912 MWh/year

  • CO2 saved

    9,470 Tonnes/year

The plant has an installed capacity of 33,75 MW that consists of 18 using the technology of Gamesa G90

San Lorenzo C

  • Spain
  • Wind
  • Operational
  • Capacity

    28 MW

  • Production

    52,484 MWh/year

  • CO2 saved

    8,189 Tonnes/year

The plant has an installed capacity of 28,125 MW that consists of 15 using the technology of Gamesa G90

Santo Toribio

  • Spain
  • Solar
  • Awaiting authorisation
  • Capacity

    64 MW

  • Production

    126,000 MWh/year

  • CO2 saved

    36,900 Tonnes/year

Renantis’ PSF Santo Toribio project will be located in Chiva, in Valencia (Spain). This new photovoltaic park will mean an estimated production of 126 GWh/year, enough to supply energy to more than 80,000 homes. The Chiva photovoltaic solar energy facility, whose construction is scheduled to begin in 2023, plans to occupy around 111 hectares and additionally reforest another 39.

Website

Ucedo

  • Spain
  • Wind
  • Awaiting authorisation
  • Capacity

    25 MW

  • CO2 saved

    49,091 Tonnes/year

The Castillo Eólico León cluster comprises the wind projects of Porqueros, Ucedo and Veldedo de Renantis and will be located in the municipalities of Magaz de Cepeda, Brazuelo, Villagatón, Santa Colomba de Somoza and Torre del Bierzo, in the province of León (Spain). .
These new wind farms will mean a total estimated production of 235 GWh/year, enough to supply energy to more than 30,000 homes.

Veldedo

  • Spain
  • Wind
  • Awaiting authorisation
  • Capacity

    25 MW

  • CO2 saved

    49,091 Tonnes/year

The Castillo Eólico León cluster comprises the wind projects of Porqueros, Ucedo and Veldedo de Renantis and will be located in the municipalities of Magaz de Cepeda, Brazuelo, Villagatón, Santa Colomba de Somoza and Torre del Bierzo, in the province of León (Spain). .
These new wind farms will mean a total estimated production of 235 GWh/year, enough to supply energy to more than 30,000 homes.

Villaherreros

  • Spain
  • Wind
  • Awaiting authorisation
  • Capacity

    48 MW

  • CO2 saved

    106,539 Tonnes/year

The Castillo Eólico Palencia cluster comprises the wind projects of Villaherreros, Villaumbrales and Perales de Renantis and will be located in the municipalities of Villaherreros, Villasarracino, Villaumbrales, Perales and Becerril de Campos, in the province of Palencia. These new wind farms will mean a total estimated production of 510 GWh/year, enough to supply energy to more than 50,000 homes.

Villaumbrales

  • Spain
  • Wind
  • Awaiting authorisation
  • Capacity

    48 MW

  • CO2 saved

    106,539 Tonnes/year

The Castillo Eólico Palencia cluster comprises the wind projects of Villaherreros, Villaumbrales and Perales de Renantis and will be located in the municipalities of Villaherreros, Villasarracino, Villaumbrales, Perales and Becerril de Campos, in the province of Palencia. These new wind farms will mean a total estimated production of 510 GWh/year, enough to supply energy to more than 50,000 homes.

© 2026 Nadara Limited – Company number SC546368