Nadara in Spain
News and updates All news articles
Recent articles
Our sites in Spain
Filter options
30 projects
Campos Salados
- Spain
- Solar
- Awaiting authorisation
Capacity
48 MW
Production
200,000 MWh/year
CO2 saved
35,949 Tonnes/year
Campos Salados project will be located in the municipality of Carcaixent, in the province of Valencia. This new photovoltaic park is estimated to produce 200 GWh/year, enough to supply energy to more than 30,000 households.
Bon Vent Vilalba
- Spain
- Wind
- Operational
Capacity
50 MW
Production
118,781 MWh/year
CO2 saved
20,320 Tonnes/year
The plant has an installed capacity of 49,8 MW that consists of 21 using the technology of Vestas V90
Cabezo de San Roque
- Spain
- Wind
- Operational
Capacity
23 MW
Production
47,494 MWh/year
CO2 saved
15,000 Tonnes/year
This wind farm is owned and operated by Eólica de Cabezo San Roque, a subsidiary of Renantis, and is located in the municipality of La Muela, around 18 miles south-west of Zaragoza in the Spanish region of Aragon. It is situated on a vast plateau, around 2,000 feet above sea level. The 23.25-MW wind farm includes 31 turbines and provides enough clean energy for over 16,000 households, reducing greenhouse gas emissions by around 15,000 tons per year.
Campanario
- Spain
- Wind
- Operational
Capacity
38 MW
Production
88,730 MWh/year
CO2 saved
15,250 Tonnes/year
The plant has an installed capacity of 38 MW that consists of 19 using the technology of Vestas V90
Campos de Levante
- Spain
- Solar
- Awaiting authorisation
Capacity
102 MW
Production
200,000 MWh/year
CO2 saved
41,780 Tonnes/year
The PSF Campos de Levante project will be located in Chiva, Valencia. This new photovoltaic plant will produce an estimated 200 GWh/year, enough to supply energy to more than 80,000 households.
Campos de Zuloaga
- Spain
- Solar
- Awaiting authorisation
Capacity
56 MW
Production
119,000 MWh/year
CO2 saved
24,859 Tonnes/year
Campos de Zuloaga project will be located between the municipalities of Cizur and Cendea de Olza in Navarra (Spain). This new photovoltaic park is estimated tol produce 119 GWh/year, enough to supply energy to more than 20,000 households.
Carrecastro
- Spain
- Wind
- Operational
Capacity
10 MW
Production
28,497 MWh/year
CO2 saved
17,000 Tonnes/year
This wind farm consists of 4 turbines, for a total capacity of 10 MW. The project also included new roads and road improvements, as well as electricity infrastructure such as ground cables, switchgears and a transformer substation. It is estimated that the wind farm will produce up to 34 GWh per year, equivalent to the electricity consumption of around 10,000 households.
Castillo Eólico León
- Spain
- Wind
- Awaiting authorisation
Capacity
75 MW
Production
235,000 MWh/year
CO2 saved
49,091 Tonnes/year
The Castillo Eólico León cluster comprises the wind projects of Porqueros, Ucedo and Veldedo de Renantis and will be located in the municipalities of Magaz de Cepeda, Brazuelo, Villagatón, Santa Colomba de Somoza and Torre del Bierzo, in the province of León (Spain). .
These new wind farms will mean a total estimated production of 235 GWh/year, enough to supply energy to more than 30,000 homes.
Castillo Eólico Palencia
- Spain
- Wind
- Awaiting authorisation
Capacity
144 MW
Production
510,000 MWh/year
CO2 saved
106,539 Tonnes/year
The Castillo Eólico Palencia cluster comprises the wind projects of Villaherreros, Villaumbrales and Perales de Renantis and will be located in the municipalities of Villaherreros, Villasarracino, Villaumbrales, Perales and Becerril de Campos, in the province of Palencia. These new wind farms will mean a total estimated production of 510 GWh/year, enough to supply energy to more than 50,000 homes.
Cerros de Radona
- Spain
- Wind
- Operational
Capacity
40 MW
Production
87,398 MWh/year
CO2 saved
14,403 Tonnes/year
The plant has an installed capacity of 40 MW that consists of 16 using the technology of General Electric GE2,5xl
Dehesilla I
- Spain
- Wind
- Operational
Capacity
47 MW
Production
88,066 MWh/year
CO2 saved
14,832 Tonnes/year
The plant has an installed capacity of 46,875 MW that consists of 25 using the technology of Gamesa G90
Dehesilla II
- Spain
- Wind
- Operational
Capacity
47 MW
Production
89,732 MWh/year
CO2 saved
14,635 Tonnes/year
The plant has an installed capacity of 46,875 MW that consists of 25 using the technology of Gamesa G90
Desafio Solar
- Spain
- Solar
- Operational
Capacity
47 MW
Production
88,637 MWh/year
El Nogal
- Spain
- Wind
- Operational
Capacity
24 MW
Production
61,676 MWh/year
CO2 saved
10,667 Tonnes/year
The plant has an installed capacity of 24 MW that consists of 12 using the technology of Vestas V90
Esquileo
- Spain
- Wind
- Operational
Capacity
47 MW
Production
89,121 MWh/year
CO2 saved
15,135 Tonnes/year
The plant has an installed capacity of 46,875 MW that consists of 25 using the technology of Gamesa G90
Fatarella
- Spain
- Wind
- Operational
Capacity
48 MW
Production
150,260 MWh/year
CO2 saved
25,896 Tonnes/year
The plant has an installed capacity of 48,3 MW that consists of 21 using the technology of Siemens WT-2.3
Fuente Vain
- Spain
- Wind
- Operational
Capacity
32 MW
Production
82,571 MWh/year
CO2 saved
14,196 Tonnes/year
The plant has an installed capacity of 32 MW that consists of 16 using the technology of Vestas V90
Fuentes
- Spain
- Wind
- Operational
Capacity
18 MW
Production
42,946 MWh/year
CO2 saved
7,304 Tonnes/year
The plant has an installed capacity of 18 MW that consists of 9 using the technology of Vestas V90
La Dehesica
- Spain
- Wind
- Operational
Capacity
29 MW
Production
69,614 MWh/year
CO2 saved
10,614 Tonnes/year
The plant has an installed capacity of 28,5 MW that consists of 19 using the technology of General Electric GE1,5sle
La Navica
- Spain
- Wind
- Operational
Capacity
30 MW
Production
74,136 MWh/year
CO2 saved
12,007 Tonnes/year
The plant has an installed capacity of 30 MW that consists of 20 using the technology of General Electric GE1,5xle
Munera I
- Spain
- Wind
- Operational
Capacity
40 MW
Production
120,224 MWh/year
CO2 saved
18,110 Tonnes/year
The plant has an installed capacity of 39,6 MW that consists of 22 using the technology of Vestas V90
Perales
- Spain
- Wind
- Awaiting authorisation
Capacity
48 MW
CO2 saved
106,539 Tonnes/year
The Castillo Eólico Palencia cluster comprises the wind projects of Villaherreros, Villaumbrales and Perales de Renantis and will be located in the municipalities of Villaherreros, Villasarracino, Villaumbrales, Perales and Becerril de Campos, in the province of Palencia. These new wind farms will mean a total estimated production of 510 GWh/year, enough to supply energy to more than 50,000 homes.
Porqueros
- Spain
- Wind
- Awaiting authorisation
Capacity
25 MW
CO2 saved
49,091 Tonnes/year
The Castillo Eólico León cluster comprises the wind projects of Porqueros, Ucedo and Veldedo de Renantis and will be located in the municipalities of Magaz de Cepeda, Brazuelo, Villagatón, Santa Colomba de Somoza and Torre del Bierzo, in the province of León (Spain). .
These new wind farms will mean a total estimated production of 235 GWh/year, enough to supply energy to more than 30,000 homes.
San Lorenzo D
- Spain
- Wind
- Operational
Capacity
34 MW
Production
61,912 MWh/year
CO2 saved
9,470 Tonnes/year
The plant has an installed capacity of 33,75 MW that consists of 18 using the technology of Gamesa G90
San Lorenzo C
- Spain
- Wind
- Operational
Capacity
28 MW
Production
52,484 MWh/year
CO2 saved
8,189 Tonnes/year
The plant has an installed capacity of 28,125 MW that consists of 15 using the technology of Gamesa G90
Santo Toribio
- Spain
- Solar
- Awaiting authorisation
Capacity
64 MW
Production
126,000 MWh/year
CO2 saved
36,900 Tonnes/year
Renantis’ PSF Santo Toribio project will be located in Chiva, in Valencia (Spain). This new photovoltaic park will mean an estimated production of 126 GWh/year, enough to supply energy to more than 80,000 homes. The Chiva photovoltaic solar energy facility, whose construction is scheduled to begin in 2023, plans to occupy around 111 hectares and additionally reforest another 39.
Ucedo
- Spain
- Wind
- Awaiting authorisation
Capacity
25 MW
CO2 saved
49,091 Tonnes/year
The Castillo Eólico León cluster comprises the wind projects of Porqueros, Ucedo and Veldedo de Renantis and will be located in the municipalities of Magaz de Cepeda, Brazuelo, Villagatón, Santa Colomba de Somoza and Torre del Bierzo, in the province of León (Spain). .
These new wind farms will mean a total estimated production of 235 GWh/year, enough to supply energy to more than 30,000 homes.
Veldedo
- Spain
- Wind
- Awaiting authorisation
Capacity
25 MW
CO2 saved
49,091 Tonnes/year
The Castillo Eólico León cluster comprises the wind projects of Porqueros, Ucedo and Veldedo de Renantis and will be located in the municipalities of Magaz de Cepeda, Brazuelo, Villagatón, Santa Colomba de Somoza and Torre del Bierzo, in the province of León (Spain). .
These new wind farms will mean a total estimated production of 235 GWh/year, enough to supply energy to more than 30,000 homes.
Villaherreros
- Spain
- Wind
- Awaiting authorisation
Capacity
48 MW
CO2 saved
106,539 Tonnes/year
The Castillo Eólico Palencia cluster comprises the wind projects of Villaherreros, Villaumbrales and Perales de Renantis and will be located in the municipalities of Villaherreros, Villasarracino, Villaumbrales, Perales and Becerril de Campos, in the province of Palencia. These new wind farms will mean a total estimated production of 510 GWh/year, enough to supply energy to more than 50,000 homes.
Villaumbrales
- Spain
- Wind
- Awaiting authorisation
Capacity
48 MW
CO2 saved
106,539 Tonnes/year
The Castillo Eólico Palencia cluster comprises the wind projects of Villaherreros, Villaumbrales and Perales de Renantis and will be located in the municipalities of Villaherreros, Villasarracino, Villaumbrales, Perales and Becerril de Campos, in the province of Palencia. These new wind farms will mean a total estimated production of 510 GWh/year, enough to supply energy to more than 50,000 homes.