Landolina

  • Italy
  • Solar
  • Operational
  • Capacity

    9 MW

  • Production

    18,562 MWh/year

  • CO2 saved

    8,600 Tonnes/year

The 9.7 MWp agri-voltaic plant in the Landolina district of Scicli (RG) combines the production of renewable energy, equal to the needs of more than 5 thousand families, with the enhancement of local agricultural crops while respecting the environmental peculiarities of the area. The project leverages on innovative methods, which have already been successfully adopted in other countries, and which represent a novelty in Italy, thanks to the adoption of specific agri-voltaic techniques that generate a beneficial impact on the territory. In order to participate in the construction and development of the Landolina park and to allow locals and Sicilian citizens to benefit from a profitable, sustainable and secure investment, Falck Renewables has launched the first lending crowdfunding initiative of the “Coltiviamo Energia” programme.

Website

Lazenay II

  • France
  • Wind
  • Operational
  • Capacity

    22 MW

  • Production

    42,965 MWh/year

The plant has an installed capacity of 21,6 MW that consists of 9 using the technology of Nordex N117 (2.4 MW)

Le Fouy

  • France
  • Wind
  • Operational
  • Capacity

    10 MW

  • Production

    14,702 MWh/year

  • CO2 saved

    12,500 Tonnes/year

The Fouy wind farm is located in the commune of Chemillé-en-Anjou, 16 km north-east of Cholet, in the department of Maine-et-Loire (49). The project involved both the former communes of La Chapelle-Rousselin and Saint-Georges-des-Gardes. The wind farm consists of 4 Nordex 90LS wind turbines of 2.5 MW each for a total output of 10 MW. It provides clean energy to almost 4,000 homes, while reducing greenhouse gas emissions by approximately 12,500 tonnes per year.

Le Gollot

  • France
  • Wind
  • Operational
  • Capacity

    10 MW

  • Production

    10,320 MWh/year

  • CO2 saved

    786 Tonnes/year

The plant has an installed capacity of 10,4 MW that consists of 8 using the technology of Siemens Bonus1,3

Le Mée

  • France
  • Wind
  • Operational
  • Capacity

    9 MW

  • Production

    14,088 MWh/year

  • CO2 saved

    1,082 Tonnes/year

The plant has an installed capacity of 9 MW that consists of 3 using the technology of Ecotecnia EC-100

Leomil

  • Portugal
  • Wind
  • Operational
  • Capacity

    16 MW

  • Production

    29,332 MWh/year

  • CO2 saved

    3,999 Tonnes/year

The plant has an installed capacity of 16,1 MW that consists of 7 using the technology of Nordex N90 – R80

Leonacco Basso

  • Italy
  • Solar
  • Awaiting authorisation
  • Capacity

    8 MW

  • Production

    11,143 MWh/year

  • CO2 saved

    2,993 Tonnes/year

The photovoltaic impianto denominato Leonacco Basso è situato nella Regione Friuli-Venezia Giulia, nel comune di Tricesimo (UD), ha una nominal potenza complessiva di circa 7.5 MW ed è costituito da 13.536 photovoltaic module installed su tracker monoassiali.

Website

Les Crêtes

  • France
  • Wind
  • Operational
  • Capacity

    10 MW

  • Production

    15,153 MWh/year

  • CO2 saved

    12,500 Tonnes/year

The Crêtes wind farm is located in the communes of La Tourlandry and Coron, 20 km north-east of Cholet, in the department of Maine-et-Loire (49), in a bocage agricultural area. It consists of 4 Nordex 90LS wind turbines of 2.5 MW each for a total power of 10 MW.

Les Youïs

  • France
  • Solar
  • Awaiting authorisation
  • Capacity

    5 MW

  • Production

    6,480 MWh/year

  • CO2 saved

    5,828 Tonnes/year

The Youïs photovoltaic park project is located in the town of Longué-Jumelles in Maine-et-Loire.

Website

Limbrici

  • Italy
  • Solar
  • Awaiting authorisation
  • Capacity

    11 MW

  • Production

    23,500 MWh/year

  • CO2 saved

    6,300 Tonnes/year

The Limbrici photovoltaic plant will fall into the territory of the Municipality of Agrigento (AG) and will be connected to the MT network of E-Distribuzione through the existing “Agrigento 2” cabin.