Malhanito
- Portugal
- Wind
- Operational
Capacity
67 MW
Production
147,852 MWh/year
The plant has an installed capacity of 66,7 MW that consists of 29 using the technology of Enercon E-82
This website uses cookies to ensure you get the best experience on our website. Learn more about our cookies.
To do that, please confirm that we may use functionality cookies.
Find out more in our Cookie Policy and Privacy Policy.
We operate onshore and offshore wind, solar, waste to energy, biomass and energy storage projects in Europe and the US. Check out our assets by country, technology or stage of development on this interactive map.
151 – 160 of 259 projects
67 MW
147,852 MWh/year
The plant has an installed capacity of 66,7 MW that consists of 29 using the technology of Enercon E-82
11 MW
25,282 MWh/year
1,580 Tonnes/year
The plant has an installed capacity of 10,8 MW that consists of 6 using the technology of Vestas V100
11 MW
22,564 MWh/year
1,425 Tonnes/year
The plant has an installed capacity of 10,8 MW that consists of 6 using the technology of Vestas V100
13 MW
19,061 MWh/year
1,264 Tonnes/year
The Mazeray-Bignay wind farm is located in the communes of Mazeray and Bignay, 21 km north of Saintes, in the Charente-Maritime department (17), on an open agricultural plateau along the A10 motorway. Commissioned in March 2013, it consists of 5 Nordex N90 wind turbines of 2.5 MW each for a total power of 12.5 MW.
9 MW
26,447 MWh/year
3,471 Tonnes/year
The plant has an installed capacity of 9 MW that consists of 4 using the technology of Vestas V80 and Vestas V90
47 MW
81,855 MWh/year
21,986 Tonnes/year
The photovoltaic plant will be located in the municipalities of Apricena and San Paolo di Civitate, in the province of Foggia, with a total power of 47.2696 MWp and made up of 82,208 photovoltaic modules installed on single-axis trackers.
7 MW
2,931 Tonnes/year
In 2019 the battery energy storage got into operation, it includes NEC’s GSS® end-to-end grid storage solution and its AEROS® controls system energy storage control software. It has a Energy Storage Capacity of 3 MW, an average energy produced of 6,6 MWh and an energy valorization with Grid Services
65 MW
155,508 MWh/year
43,001 Tonnes/year
The Millennium wind farm is situated 6 miles west of Fort Augustus and has been operational since 2009. Funding from Millennium is administered by Fort Augustus and Glenmoriston Community Company and the Glengarry Trust.
56 MW
124,067 MWh/year
43,617 Tonnes/year
26
As it becomes vital to combat climate change by producing more electricity from renewable sources, allowing fossil fuels to be phased out, we are proposing to extend the existing Millennium Wind Farm west of Fort Augustus and north of Invergarry.
Our proposal is for up to eight wind turbines to the east of the existing wind farm with an installed capacity of around 56 MW
675 MW
1,000,000 Tonnes/year
The equal partnership between Nadara and Bluefloat Energy has submitted a project proposal to build Minervia Energia, a floating marine wind farm off the coast of Catanzaro.
© 2026 Nadara Limited – Company number SC546368