This website uses cookies to ensure you get the best experience on our website. Learn more about our cookies.

Skip to main content
Background image Nadara

Our Sites

Filter options

Filter by location

Filter by technology

Filter by status

Malhanito

  • Portugal
  • Wind
  • Operational
  • Capacity

    67 MW

  • Production

    147,852 MWh/year

The plant has an installed capacity of 66,7 MW that consists of 29 using the technology of Enercon E-82

Marcellois

  • France
  • Wind
  • Operational
  • Capacity

    11 MW

  • Production

    25,282 MWh/year

  • CO2 saved

    1,580 Tonnes/year

The plant has an installed capacity of 10,8 MW that consists of 6 using the technology of Vestas V100

Massingy

  • France
  • Wind
  • Operational
  • Capacity

    11 MW

  • Production

    22,564 MWh/year

  • CO2 saved

    1,425 Tonnes/year

The plant has an installed capacity of 10,8 MW that consists of 6 using the technology of Vestas V100

Mazeray-Bignay

  • France
  • Wind
  • Operational
  • Capacity

    13 MW

  • Production

    19,061 MWh/year

  • CO2 saved

    1,264 Tonnes/year

The Mazeray-Bignay wind farm is located in the communes of Mazeray and Bignay, 21 km north of Saintes, in the Charente-Maritime department (17), on an open agricultural plateau along the A10 motorway. Commissioned in March 2013, it consists of 5 Nordex N90 wind turbines of 2.5 MW each for a total power of 12.5 MW.

Meroicinha

  • Portugal
  • Wind
  • Operational
  • Capacity

    9 MW

  • Production

    26,447 MWh/year

  • CO2 saved

    3,471 Tonnes/year

The plant has an installed capacity of 9 MW that consists of 4 using the technology of Vestas V80 and Vestas V90

Mezzanelle

  • Italy
  • Solar
  • Awaiting authorisation
  • Capacity

    47 MW

  • Production

    81,855 MWh/year

  • CO2 saved

    21,986 Tonnes/year

The photovoltaic plant will be located in the municipalities of Apricena and San Paolo di Civitate, in the province of Foggia, with a total power of 47.2696 MWp and made up of 82,208 photovoltaic modules installed on single-axis trackers.

Website

Middleton

  • United States
  • Storage
  • Operational
  • Capacity

    7 MW

  • CO2 saved

    2,931 Tonnes/year

In 2019 the battery energy storage got into operation, it includes NEC’s GSS® end-to-end grid storage solution and its AEROS® controls system energy storage control software. It has a Energy Storage Capacity of 3 MW, an average energy produced of 6,6 MWh and an energy valorization with Grid Services

Millennium

  • United Kingdom
  • Wind
  • Operational
  • Capacity

    65 MW

  • Production

    155,508 MWh/year

  • CO2 saved

    43,001 Tonnes/year

The Millennium wind farm is situated 6 miles west of Fort Augustus and has been operational since 2009. Funding from Millennium is administered by Fort Augustus and Glenmoriston Community Company and the Glengarry Trust.

Millennium East

  • United Kingdom
  • Wind
  • Awaiting authorisation
  • Capacity

    56 MW

  • Production

    124,067 MWh/year

  • CO2 saved

    43,617 Tonnes/year

  • Turbines

    26

As it becomes vital to combat climate change by producing more electricity from renewable sources, allowing fossil fuels to be phased out, we are proposing to extend the existing Millennium Wind Farm west of Fort Augustus and north of Invergarry.
Our proposal is for up to eight wind turbines to the east of the existing wind farm with an installed capacity of around 56 MW

Website

Minervia Energia

  • Italy
  • Wind
  • Awaiting authorisation
  • Capacity

    675 MW

  • CO2 saved

    1,000,000 Tonnes/year

The equal partnership between Nadara and Bluefloat Energy has submitted a project proposal to build Minervia Energia, a floating marine wind farm off the coast of Catanzaro.

Website

© 2026 Nadara Limited – Company number SC546368