Montagne Fayel
- France
- Wind
- Operational
Installed capacity
12 MW
Energy produced
27,028 MWh/year
CO2 reductions
1,652 t/year
Montagne Fayel Wind Farm comprises six Vestas V100 turbines for a total installed capacity of 12MW.
This website uses cookies to ensure you get the best experience on our website. Learn more about our cookies.
To do that, please confirm that we may use functionality cookies.
Find out more in our Cookie Policy and Privacy Policy.
We operate onshore and offshore wind, solar, waste to energy, biomass and energy storage sites in Europe and the US. Check out our assets and projects by country, technology or stage of development on this interactive map.
161 – 180 of 262 projects
12 MW
27,028 MWh/year
1,652 t/year
Montagne Fayel Wind Farm comprises six Vestas V100 turbines for a total installed capacity of 12MW.
8 MW
11,845 MWh/year
774 t/year
Montloué Wind Farm comprises four Enercon E70 turbines rated at 2000kW each for a total installed capacity of 8MW.
44 MW
120,224 MWh/year
18,110 t/year
Munera I Wind Farm comprises 22 Vestas V90 turbines rated at 2000kW each for a total installed capacity of 44MW.
6 MW
5,703 MWh/year
2,806 t/year
The Musgrave PV solar project is located in Aurora, New York and has been grid-connected since December 2016. The plant has an installed capacity of 5.74MWp, comprising 17,936 multi-crystalline modules distributed across two sites: Musgrave East and Musgrave West (8,968 per site). The fixed-tilt array is set to a tilt angle of 20° and has a southerly orientation.
14 MW
39,620 MWh/year
17,750 t/year
Mynydd Clogau Wind Farm is situated on working farmland near the village of Adfa which is around 10 miles north of the market town of Newton and 14 miles east of Welshpool. The wind farm is set amongst delightful mid-Wales countryside which is popular with ramblers and mountain bikers. Mynydd Clogau commenced operations in January 2006 after 10 months of construction and became part of the Nadara portfolio in 2018. Its 17 turbines have an installed rating of 850kW, giving the site a capacity of 14.45MW with the ability to generate enough energy to power 11,923 homes.
26 MW
85,670 MWh/year
16,569 t/year
6
Mynydd Fforch-Dwm Wind Farm is a proposal by Naturalis Energy to provide clean, carbon-free energy to homes and businesses across South Wales, with a new renewable energy park near to the village of Tonmawr in Neath Port Talbot.
Naturalis is a joint venture between Nadara and REG Windpower, two leading renewable energy companies powering millions of homes across the UK and Europe.
11 MW
29,612 MWh/year
13,266 t/year
Mynydd Gorddu Wind Farm can be found in the county of Ceredigion, approximately 3km south east of the village of Tal-y-bont which itself is midway between the towns of Aberystwyth and Machynlleth. Historically, Tal-y-bont has close associations with lead and silver mining and with the woollen mills that once dominated the local economy. Work on the construction of the wind farm began in the winter of 1997 and it was completed in the spring of 1998. Mynydd Gorddu Wind Farm has one of the most consistent outputs in the country. Its 19 turbines are of two different types, rated at 550kW and 600kW respectively. They have the capacity to generate 10.8MW of power, enough to supply 8,911 homes with electricity.
795 MW
1,500,000 t/year
Nadara is developing the 795MW Nora Energia 1, and the 600MW Nora Energia 2 floating offshore wind farms off the Sardinian coast, in the Gulf of Cagliari.
796 MW
1,500,000 t/year
Nadara is developing the 795MW Nora Energia 1, and the 600MW Nora Energia 2 floating offshore wind farms off the Sardinian coast, in the Gulf of Cagliari.
8 MW
8,064 MWh/year
775 t/year
North Eagle Village is a Community Solar project in upstate New York.
18 MW
50,588 MWh/year
22,663 t/year
Where once there was open-cast mining for energy of a different kind, the North Steads Wind Farm generates enough power to run 15,223 homes. The wind farm is located on land that was part of the East Chevington (Maidens Hall/Steadsburn) opencast coal mine, which ceased operations in 1991. It was then restored to forestry and farmland in 2000 with work on the turbines beginning in August 2015. Six of the nine turbines are located within the forested area, with the remaining three in arable fields to the south. The project is also a close neighbour to the four-turbine 8.2MW Sisters Wind Farm which is also owned by Nadara. Acquired in 2015, North Steads' nine turbines are rated at just over 2MW, giving the site an installed capacity of 18.45MW.
1 MW
717 MWh/year
487 t/year
Notarpanaro is connected to the public distribution network into which the energy produced is supplied without the need to install electricity accumulators.
17 MW
46,612 MWh/year
20,882 t/year
Novar Wind Farm sits in a picturesque Highland location approximately 5.5 miles west of Alness. From its elevated position on an extensive Easter Ross shooting estate it enjoys commanding views of the Cromarty Firth and Ben Wyvis. As well as being steeped in the history of Scotland's Highland clans, the area is well known for its contribution to Highland employment with a number of light and heavy industries based locally. The yards at Invergordon and Nigg play a significant role in offshore development in the oil and gas sectors and, more recently, have been heavily involved in fabrication for renewables including offshore wind farms. Novar was built in 1997 and its 34 turbines are rated at 500kW giving the site has an installed capacity of 17MW, generating enough energy to power 14,027 homes.
13 MW
18,012 MWh/year
1,330 t/year
Noyales Wind Farm is located in the communes of Noyales and Hauteville, 18km northeast of Saint-Quentin, in the Aisne department. Commissioned in August 2009, it comprises five Fuhrlander turbines for a total installed capacity of 12.5MW.
15 MW
41,128 MWh/year
18,425 t/year
Nutberry Wind Farm is located near Nutberry Hill, four miles west of Coalburn in South Lanarkshire and has been operational since 2013. Funding from Nutberry is administered by South Lanarkshire Renewable Energy Fund.
1,300 MW
2,500,000 t/year
Nadara is developing the 774MW Odra Energia floating offshore wind farm off the southern coast of the province of Lecce.
114 MW
286,138 MWh/year
33,950 t/year
Pampilhosa Wind Farm comprises 38 Vestas V90 turbines rated at 3000kW each for a total installed capacity of 114MW.
12 MW
28,168 MWh/year
1,811 t/year
Patay Wind Farm comprises six Vestas V90 turbines rated at 2000kW each for a total installed capacity of 12MW.
15 MW
30,498 MWh/year
2,019 t/year
Pauvres Wind Farm comprises five Vestas V117 turbines rated at 3000kW each for a total installed capacity of 15MW.
48 MW
106,539 t/year
The Castillo Eólico Palencia cluster comprises the wind projects of Villaherreros, Villaumbrales and Perales de Nadara and will be located in the municipalities of Villaherreros, Villasarracino, Villaumbrales, Perales and Becerril de Campos, in the province of Palencia. These new wind farms will mean a total estimated production of 510 GWh/year, enough to supply energy to more than 50,000 homes.
© 2026 Nadara Limited – Company number SC546368