Glyn Taff
- United Kingdom
- Solar
- Awaiting authorisation
Installed capacity
40 MW
Energy produced
35,000 MWh/year
CO2 reductions
18,000 t/year
The site is ideally located for access to the local electricity grid network, being only 3km from the nearest substation at Upper Boat, Treforest.
Electricity generated will enter the National Grid transmission network and be transported across Wales.