Candeeiros OVP
- Portugal
- Wind
- Operational
Capacity
10 MW
Production
33,963 MWh/year
CO2 saved
4,422 Tonnes/year
The plant has an installed capacity of 10 MW that consists of 5 using the technology of Senvion MM 100
This website uses cookies to ensure you get the best experience on our website. Learn more about our cookies.
To do that, please confirm that we may use functionality cookies.
Find out more in our Cookie Policy and Privacy Policy.
We operate onshore and offshore wind, solar, waste to energy, biomass and energy storage projects in Europe and the US. Check out our assets by country, technology or stage of development on this interactive map.
51 – 60 of 259 projects
10 MW
33,963 MWh/year
4,422 Tonnes/year
The plant has an installed capacity of 10 MW that consists of 5 using the technology of Senvion MM 100
12 MW
20,803 MWh/year
1,161 Tonnes/year
The plant has an installed capacity of 12 MW that consists of 6 using the technology of Vestas V90
8 MW
15,400 MWh/year
4,100 Tonnes/year
Capofeto photovoltaic plant, in the province of Trapani, will have a total nominal power of 7.8 MWp (Megawatt peak). The plant will be located in the municipality of Marsala, in the Baglio Chitarra district, and it will be connected to E-Distribuzione’s MV network through the Matarocco Primary Cabin.
3 MW
5,133 MWh/year
2,480 Tonnes/year
This plant is grid connected, namely, it is connected to the public distribution network into which the energy produced is supplied, so there is no need to install electricity accumulators. The photovoltaic modules consist of 16,440 polycrystalline silicon photovoltaic cells with stable performance over time and a high return. The cells are encapsulated within a layer of EVA, a non-hygroscopic UV-stable polymer, and tempered glass. The modules are south facing and tilted at a 20° angle, defined so as to optimize the annual yield in a way that is compatible with the need to limit mutual shading and the area available.
10 MW
28,497 MWh/year
17,000 Tonnes/year
This wind farm consists of 4 turbines, for a total capacity of 10 MW. The project also included new roads and road improvements, as well as electricity infrastructure such as ground cables, switchgears and a transformer substation. It is estimated that the wind farm will produce up to 34 GWh per year, equivalent to the electricity consumption of around 10,000 households.
75 MW
235,000 MWh/year
49,091 Tonnes/year
The Castillo Eólico León cluster comprises the wind projects of Porqueros, Ucedo and Veldedo de Renantis and will be located in the municipalities of Magaz de Cepeda, Brazuelo, Villagatón, Santa Colomba de Somoza and Torre del Bierzo, in the province of León (Spain). .
These new wind farms will mean a total estimated production of 235 GWh/year, enough to supply energy to more than 30,000 homes.
144 MW
510,000 MWh/year
106,539 Tonnes/year
The Castillo Eólico Palencia cluster comprises the wind projects of Villaherreros, Villaumbrales and Perales de Renantis and will be located in the municipalities of Villaherreros, Villasarracino, Villaumbrales, Perales and Becerril de Campos, in the province of Palencia. These new wind farms will mean a total estimated production of 510 GWh/year, enough to supply energy to more than 50,000 homes.
30 MW
86,000 MWh/year
46,000 Tonnes/year
Castrum is a wind farm project located in the Municipality of Castronovo di Sicilia (PA) and, for connection works, in the Municipality of Cammarata (AG).
48 MW
98,813 MWh/year
20,553 Tonnes/year
Causeymire Wind Farm is the most northerly site in the Ventient Energy portfolio. It ‘s around 15 miles west-northwest of the town of Wick next to the A9 main road on the way to Thurso. The wind farm is situated on Dale Moss, a large area of peatland commanding views across the wilderness of the Flow Country to Morven, the highest point in Caithness. The land below the turbines is also used for grazing cattle. The site was originally developed by nPower in 2003 before being transferred to Beaufort, then Infinis and now Ventient Energy. Its 21 turbines are rated at 2.3MW and the site has an installed capacity of 48.3MW, generating enough energy to power .
59 MW
110,723 MWh/year
39,489 Tonnes/year
The Cefn Croes wind farm consists of 39 turbines and is located near Devils Bridge, 15 km east of Aberystwyth, Wales and has been operational since 2005. Funding from Cefn Croes is administered by Cefn Croes Wind Farm Community Trust.
© 2026 Nadara Limited – Company number SC546368