Background image Nadara

Our Sites

Filter options

Filter by location

Filter by technology

Filter by status

Candeeiros OVP

  • Portugal
  • Wind
  • Operational
  • Capacity

    10 MW

  • Production

    33,963 MWh/year

  • CO2 saved

    4,422 Tonnes/year

The plant has an installed capacity of 10 MW that consists of 5 using the technology of Senvion MM 100

Canet - Pont de Salars

  • France
  • Wind
  • Operational
  • Capacity

    12 MW

  • Production

    20,803 MWh/year

  • CO2 saved

    1,161 Tonnes/year

The plant has an installed capacity of 12 MW that consists of 6 using the technology of Vestas V90

Capofeto

  • Italy
  • Solar
  • Awaiting authorisation
  • Capacity

    8 MW

  • Production

    15,400 MWh/year

  • CO2 saved

    4,100 Tonnes/year

Capofeto photovoltaic plant, in the province of Trapani, will have a total nominal power of 7.8 MWp (Megawatt peak). The plant will be located in the municipality of Marsala, in the Baglio Chitarra district, and it will be connected to E-Distribuzione’s MV network through the Matarocco Primary Cabin.

Website

Cardonita

  • Italy
  • Solar
  • Operational
  • Capacity

    3 MW

  • Production

    5,133 MWh/year

  • CO2 saved

    2,480 Tonnes/year

This plant is grid connected, namely, it is connected to the public distribution network into which the energy produced is supplied, so there is no need to install electricity accumulators. The photovoltaic modules consist of 16,440 polycrystalline silicon photovoltaic cells with stable performance over time and a high return. The cells are encapsulated within a layer of EVA, a non-hygroscopic UV-stable polymer, and tempered glass. The modules are south facing and tilted at a 20° angle, defined so as to optimize the annual yield in a way that is compatible with the need to limit mutual shading and the area available.

Carrecastro

  • Spain
  • Wind
  • Operational
  • Capacity

    10 MW

  • Production

    28,497 MWh/year

  • CO2 saved

    17,000 Tonnes/year

This wind farm consists of 4 turbines, for a total capacity of 10 MW. The project also included new roads and road improvements, as well as electricity infrastructure such as ground cables, switchgears and a transformer substation. It is estimated that the wind farm will produce up to 34 GWh per year, equivalent to the electricity consumption of around 10,000 households.

Castillo Eólico León

  • Spain
  • Wind
  • Awaiting authorisation
  • Capacity

    75 MW

  • Production

    235,000 MWh/year

  • CO2 saved

    49,091 Tonnes/year

The Castillo Eólico León cluster comprises the wind projects of Porqueros, Ucedo and Veldedo de Renantis and will be located in the municipalities of Magaz de Cepeda, Brazuelo, Villagatón, Santa Colomba de Somoza and Torre del Bierzo, in the province of León (Spain). .
These new wind farms will mean a total estimated production of 235 GWh/year, enough to supply energy to more than 30,000 homes.

Website

Castillo Eólico Palencia

  • Spain
  • Wind
  • Awaiting authorisation
  • Capacity

    144 MW

  • Production

    510,000 MWh/year

  • CO2 saved

    106,539 Tonnes/year

The Castillo Eólico Palencia cluster comprises the wind projects of Villaherreros, Villaumbrales and Perales de Renantis and will be located in the municipalities of Villaherreros, Villasarracino, Villaumbrales, Perales and Becerril de Campos, in the province of Palencia. These new wind farms will mean a total estimated production of 510 GWh/year, enough to supply energy to more than 50,000 homes.

Website

Castrum

  • Italy
  • Wind
  • Awaiting authorisation
  • Capacity

    30 MW

  • Production

    86,000 MWh/year

  • CO2 saved

    46,000 Tonnes/year

Castrum is a wind farm project located in the Municipality of Castronovo di Sicilia (PA) and, for connection works, in the Municipality of Cammarata (AG).

Website

Causeymire

  • United Kingdom
  • Wind
  • Operational
  • Capacity

    48 MW

  • Production

    98,813 MWh/year

  • CO2 saved

    20,553 Tonnes/year

Causeymire Wind Farm is the most northerly site in the Ventient Energy portfolio. It ‘s around 15 miles west-northwest of the town of Wick next to the A9 main road on the way to Thurso. The wind farm is situated on Dale Moss, a large area of peatland commanding views across the wilderness of the Flow Country to Morven, the highest point in Caithness. The land below the turbines is also used for grazing cattle. The site was originally developed by nPower in 2003 before being transferred to Beaufort, then Infinis and now Ventient Energy. Its 21 turbines are rated at 2.3MW and the site has an installed capacity of 48.3MW, generating enough energy to power .

Cefn Croes

  • United Kingdom
  • Wind
  • Operational
  • Capacity

    59 MW

  • Production

    110,723 MWh/year

  • CO2 saved

    39,489 Tonnes/year

The Cefn Croes wind farm consists of 39 turbines and is located near Devils Bridge, 15 km east of Aberystwyth, Wales and has been operational since 2005. Funding from Cefn Croes is administered by Cefn Croes Wind Farm Community Trust.